Skip to content

Exterior

Patio or concrete slab

Square feet, thickness, and a broom finish or stamped concrete.

A patio here is a new concrete slab on a gravel base, priced by the square foot. Choose 4, 5, or 6 inches. Four inches is a normal patio. Five or six inches is for a hot-tub pad, a driveway apron, or ground that moves. Thicker slabs use more concrete. The base, the forms, and most of the labor do not rise as fast, so a 6-inch slab is not simply 50 percent more money.

Plain is a broom finish: gray concrete and control joints. Stamped adds color, mats, release, and sealer, plus the time to texture the slab before it sets. Stamping is an add-on to the same slab, not a different structure.

The estimate includes mesh and forms where a concrete truck can reach. It does not include breaking out old concrete or pumping up a hill. Soil that has to be replaced will push a quote toward the high end. Sales tax is left out. Prices are 2026 US national averages.

Thickness

Four inches is a typical patio. Six inches is for a hot tub or a driveway apron.

2026 US national average

Typical total

$3,408

Materials $1,728Labor $1,680

Low
$2,280
Typical
$3,408
High
$4,920

Breakdown

Each line is the typical column, rounded to the nearest dollar. The low and high totals use the low and high price of every line.

  • Concrete slab, 4 in

    240 sq ft · broom-ready gray concrete, gravel base, mesh, and forms

    $3,408Mat $1,728 · Labor $1,680

  • Four inches is a typical patio. Five or six inches suits a hot-tub pad or a driveway apron.
  • The site is assumed reachable by a concrete truck. Pumping is not included.
  • Breaking out and hauling old concrete is not included.

Worked example

The page opens on 240 square feet at 4 inches thick with a broom finish. That is a 12-by-20 patio, or close to it, with a gravel base, mesh, and forms included. No old concrete is being broken out.

The typical total with labor is $3,408. Materials are $1,728 and labor is $1,680. Low is $2,280 and high is $4,920.

Turn stamping on and a second line appears for color, mats, and sealer. Raise the thickness to 6 inches and the concrete portion grows, but the total does not jump by half, because the base and most of the labor stay put.